The top 6"-10" of
the base is pulverized, mixed, compacted and recycled into the road
base. Variables in this process include:
 | Aggregate gradation and soil composition are
variables that affect the base stability.
|
 | A thorough mixture in the top 6"-10" must
be provided.
|
 | Adequate drainage must be available.
|
 | Emulsified asphalt increases stability. The
proper percentage of asphalt needed for the proper stability is
determined by laboratory or engineering analysis.
|
 | A 4%-6% asphalt residual in the base has proven to
be very successful for this process.
|
 | The final step in stabilization is the use of a
single or double Seal Coat/ Armor Coat asphaltic overlay. |
|



|